Austin’s UV intensity and heat cycles wear acrylic coatings faster than in cooler climates, and Central Texas clay soils can shift under slabs, widening cracks over time. The builder starts with a surface inspection that identifies crack patterns, low spots, and drainage failures before any repair material is applied. Pressure washing follows to remove loose coating, algae, and debris so the repair layers bond correctly.
Crack filler is worked into each fracture and allowed to cure before patch binder is applied to low spots. Skipping the cure interval between those steps is what causes repairs to fail within a season. Once the substrate is stable and level, the builder applies the acrylic resurfacer in the specified number of coats, followed by the color coat and regulation line striping.
Not every worn court needs a full resurfacing. Some courts need only crack repair and a fresh color coat; others have subgrade movement that requires drainage correction before any surface work makes sense. The on-site evaluation determines which scope applies to your court, and the written estimate covers only the work the surface actually needs, not a standard package applied regardless of condition.