FAQs
Court Design & Site Preparation Questions
Every question we get asked about court design & site preparation, answered straight.
Questions
Problems & Symptoms
Do I need drainage work before building a court?
Yes, in most cases. A hard court surface is impermeable, so water that previously soaked into your lawn now has to go somewhere. Without planned drainage, it pools on the surface or undercuts the base. The on-site evaluation checks existing drainage patterns before any prep work is scoped.
What problems happen if the site is not prepared well?
Poor prep leads to surface cracking, low spots that collect water, and uneven playing areas that develop within a few seasons. Base material that was not properly compacted shifts under load, which separates the surface layer from the sub-base. Fixing those problems later costs significantly more than doing the prep correctly the first time.
What happens if the ground looks level but drainage is still off?
Visual level and proper drainage slope are different things. A surface that appears flat can still hold water if it crowns slightly in the center or drains toward the court rather than away from it. The on-site evaluation uses grade measurements, not visual inspection, to catch exactly this problem.
Could poor site prep cause cracking, puddling, or an uneven playing surface?
Yes, all three. Inadequate compaction causes settling that cracks the surface layer. Insufficient drainage slope creates puddles that freeze, expand, and widen cracks over time. An uneven sub-base telegraphs through the finished surface, creating dead spots and trip hazards that worsen each season.
Questions
Cost & Pricing
What can make the prep work cost more after we start opening up the ground?
Hidden conditions are the main driver: buried concrete, unexpected rock, saturated soil, or drainage infrastructure that has to be rerouted. Most jobs come in at $5,000-$15,000, but opening the ground can reveal conditions the surface evaluation could not detect, which adds excavation or remediation work.
Questions
Is It Right for You?
How do I know if my yard can fit a sports court?
An on-site evaluation measures your available space and checks drainage before anything else. A standard half-court basketball setup needs roughly 30 by 25 feet; a full pickleball court needs 44 by 20 feet minimum, plus buffer. Most yards that feel too small still have workable options once the site is assessed properly.
Can a sports court be built on a sloped yard?
Yes, but the slope has to be cut and filled to bring the court area within acceptable tolerances before surfacing begins. Mild slopes are straightforward; steeper grades require more grading and retaining work. The site evaluation determines exactly how much rework the terrain needs.
Will the plan cover grading, drainage, and the full build area?
Yes. The itemised written estimate covers base preparation, surfacing, fencing, lighting, and line marking as separate line items, so grading and drainage are scoped explicitly rather than bundled into a vague total. You see exactly what each phase covers before signing off.
What if my yard already has some slope that seems fine?
A slope that feels fine for a lawn can still be too steep or inconsistent for a court surface. Courts need a controlled, uniform grade of around 1 percent. The on-site evaluation takes actual measurements to confirm whether your existing slope is within tolerance or needs correction.
Can you level a court site on hilly terrain without creating drainage issues?
Yes, with the right cut-and-fill approach and retaining where needed. The key is directing the water that previously flowed through the graded area to a new path that avoids the court base. Hilly sites require more detailed drainage planning, which is addressed during the on-site evaluation.
Questions
Comparing Your Options
Is site prep just leveling the ground?
No. Leveling is one part of it, but site prep also covers clearing vegetation, removing topsoil, compacting a stable sub-base, and routing drainage away from the court footprint. Skipping any of those steps leaves the surface vulnerable to settling, cracking, and standing water.
Should I do the grading myself or have a pro handle it?
DIY grading rarely achieves the 1-percent tolerance a court surface requires, and an over-graded or under-graded base voids the surfacing work. Court grading also involves compaction equipment and sub-base layering that goes beyond typical landscaping. Getting it wrong means tearing out the surface to redo the base.
Can a handyman do the site prep, or does it need a full prep plan?
A handyman can clear brush and do rough grading, but court prep requires precise elevation control, engineered compaction, and drainage routing that general labor is not set up to deliver. A full prep plan ties those steps together so the surface layer has a base that will not shift.
Questions
How It Works
How much grading is needed before the court surface can be built?
The court area needs to slope no more than 1 percent in any direction to shed water without affecting play. How much earthwork that requires depends entirely on your existing grade. The on-site evaluation measures current elevations and determines the cut-and-fill volume before a written estimate is produced.
How much of my yard will need to be reworked before the court goes in?
Typically only the court footprint plus a few feet of buffer for drainage and fencing posts. The on-site evaluation maps the exact area so you know upfront what gets disturbed. Yards with significant slope or drainage problems may require a slightly wider work zone to route water away effectively.
What does site prep include before court construction starts?
Site prep covers vegetation removal, topsoil stripping, sub-grade shaping to the correct slope, compacted aggregate base installation, and drainage routing. Each step has to be complete and inspected before the surface layer goes down. The written estimate lists these phases separately so nothing is assumed.
How do you figure out the right court layout for my property?
The on-site evaluation maps available space, existing grades, drainage flow, and access points. From that, the layout is oriented to make the most of usable area while keeping drainage running away from the court. The written estimate then confirms dimensions, orientation, and buffer zones before work begins.
Will site prep change the rest of my yard access during the build?
Equipment access routes are planned during the site evaluation to limit disruption to the rest of the yard. Typically, one entry path is used for machinery and materials. The final walkthrough before sign-off confirms the surrounding area is left in acceptable condition.
How do you prepare a site with expansive clay soil before court construction?
Expansive clay shrinks and swells with moisture, which cracks rigid surfaces. The standard approach is to remove the clay layer to a sufficient depth, replace it with a stable compacted aggregate base, and route drainage so moisture changes under the court stay minimal. The on-site evaluation identifies clay presence before the estimate is written.
What do you do if the site has limestone bedrock or thin soils?
Shallow limestone is common across the Austin area. Where bedrock sits close to the surface, the prep plan adjusts base depth and drainage design to work with the rock rather than excavating through it. Thin soils over rock can actually provide a stable platform once the surface is properly leveled and drained.
How do you design for dry spells followed by heavy rainfall?
The base is compacted to resist shrinkage during dry periods, and drainage is routed to move heavy rainfall away quickly without saturating the sub-base. In Central Texas, where long dry stretches and intense storms are both common, getting that balance right during the design phase prevents most long-term surface problems.
Can a court be built on a sloped yard?
Yes, but the slope has to be corrected first. Cut-and-fill grading or fill-only work brings the subgrade to a consistent level. A laser level confirms the finished grade meets the required slope tolerance before any base material is placed.
What happens if site prep is skipped or rushed?
Poor prep leads to uneven play surfaces, standing water, cracking, and base movement. Correcting a failed base after the surface is down means tearing out finished work, a cost that is almost always higher than doing the prep correctly the first time.
Does Austin’s clay soil cause problems for court construction?
Expansive clay shifts with seasonal moisture, which can heave or crack a base that was not prepared for it. The excavation depth, fill type, and compaction method are all adjusted based on the soil conditions found during the on-site evaluation.
Questions
Guarantees & Peace of Mind
Will the prep plan handle water runoff and long-term stability?
Yes. The on-site evaluation specifically checks drainage alongside the space assessment, and the written estimate covers base preparation as a line item. Drainage routing and sub-base compaction are both addressed before surfacing begins, so the court stays stable through wet and dry cycles.
Can the site be cleared without damaging nearby landscaping or structures?
Careful clearing is part of the site evaluation process. The crew identifies trees, irrigation lines, fences, and structures near the work zone before any equipment moves. Buffer zones are marked and equipment access routes are planned to keep disturbance outside the court footprint.
Tell Us Your Site & Sport
Every enquiry starts with a free on-site assessment of your space and drainage, so the estimate reflects what the project actually involves.